+386 1 306 84 00
info@2-tdk.si

Technical information

Facilities on the track

number of tunnels: 7 (T1, T2, T3, T4, T5-6, T7, T8)
T1: 6.714 m
T2: 6.017 m
T3: 335 m
T4: 1.949 m
T5-6: 513 m
T7: 1.154 m
T8: 3.808 m
total length of tunnels

(without service pipes):

20,5 km
longest tunnel: 6.714 m
number of viaducts: 3 (Glinščica, Gabrovica, Vinjan)
Glinščica: 215 m
Gabrovica: 416 m
Vinjan: 620 m
total length of viaducts: 1.251 m

 

Skip to content