strings.skip_to_content
drugitir.si
sl
Menu
Construction

Watch a flyover of the route from Divača to Koper!

16. October 2025

🚧Since 75% of the railway line runs through tunnels, the video mainly shows the sections of the route that are visible on the surface - 🌉viaducts, construction sites of individual tunnel portals, and in certain sections, already fully completed structures equipped with tracks and other railway infrastructure.

🛤In the first tunnel, Lokev (T1), tracks are already being laid. In the Glinščica valley, a ventilation station is being constructed, and the drone has just captured the laying of tracks between the Gabrovica viaduct and the third tunnel along the route.

🚉The section between Črni Kal and Koper is structurally completed, and railway infrastructure as well as electro-mechanical and safety systems are being gradually installed.

Prelet trase od Divače do Kopra
Prelet trase od Divače do Kopra