  • Viaduct Glinščica

Viaduct Glinščica

The work is in progress

About the viaduct Glinščica

The construction of the Glinščica viaduct was a precondition for the start of the construction of the Lokev (T1) and Beka (T2) tunnels on both sides. It is designed as a closed box reinforced concrete structure. The innovative design of the viaduct allows for adequate ventilation of the Lokev (T1) and Beka (T2) tunnels and protection against derailment, wind, noise and emissions in the protected Beka Landscape Park. The Glinščica Viaduct will connect the 6.7-kilometre Lokev Tunnel 1, the longest tunnel on the Track 2 route, and the 6-kilometre Beka Tunnel 2 into a single tunnel almost 13 kilometres long. 

215
m

Viaduct length 

10
m

Height of individual columns 

2021-2022

Construction time 

Work on the project

Excavation works

0%

Other concrete works

0%

Tracks

0%

Vehicle network

0%

Technical specifications

Location: Glinščica river valley, Municipality Hrpelje - Kozina
Construction time: 2021–2022
Construction: Prestressed reinforced concrete semi-integral box construction
Length: 215 meters
Contractors: Ponting inženirski biro, d. o. o. (PGD) in KO-BIRO, d. o. o. (PZI)
Executors: MarkoMark Nival, d. o. o., Nival invest, d. o. o., in Ekorel, d. o. o.